Case Overview: A mature gas well possessed ample natural reservoir pressure but was severely choked by downhole liquid loading. Its production had dwindled to a sluggish 1,250 m³/day. By deploying an integrated 2.0 dual-skid package—combining high-pressure gas lift with a liquid-driven multiphase transfer pump—field engineers cleared the liquid blockage and boosted continuous daily output to 10,000 m³/day.
The Bottleneck: High Reservoir Energy, Zero Flow
For years, the daily monitoring logs for the choked well told a frustrating story:
-
Tubing Pressure: 1.6 MPa
-
Casing Pressure: 3.75 MPa
-
Pressure Differential ( ΔP): A stable 2.0 MPa
The 2.0 MPa tubing-casing pressure differential proved that the underground formation still retained plenty of native drive energy. Moreover, with virtually zero water cut and an H2S content of just 38 m³/day, downhole corrosion risk was negligible. On paper, the well’s physical conditions were ideal.
Yet, actual production was stuck at a mere 1,250 m³/day, while surrounding wells in the same block easily produced 10,000 to 50,000 m³/day.
Why Was the Well Choking?
-
Severe Liquid Loading: Years of continuous production caused heavy static liquids to settle at the bottom of the wellbore, creating a dense hydrostatic head that suffocated natural gas flow.
-
High Backpressure: Elevated gathering pipeline backpressure at the wellhead severely compressed the available drawdown pressure differential.
-
Power Grid Limitations: Conventional artificial lift methods (like periodic soap injection or intermittent shut-ins) provided only temporary relief. Meanwhile, the wellsite was constrained by a small 50 kVA transformer, making it impossible to hook up traditional high-power electric boosting equipment without massive grid upgrades.
The Tailored Solution: Integrated “Gas Lift + Multiphase Boosting” 2.0 Skids
To revive the well without costly infrastructure overhauls, the engineering team deployed a mobile, fully integrated dual-skid solution split into three modular units:
[Wellhead] ──> [H2000 Gas Lift Skid] ──> Unblocks Liquid Accumulation
│
└──> [H3000 Multiphase Pump Skid] ──> Continuous Low-Pressure Boosting
▲
├── 50 kW Gas Generator (Primary Power)
└── 100 kW Diesel Generator (Peak Lift Load)
1. H3000 Multiphase Transfer Pump Skid (Continuous Production Engine)
-
Power System: 22 kW hydraulic station (30 kW total system power).
-
Performance: Handles up to 10,000 m³/day standard displacement at a maximum differential pressure of 0.8 MPa.
-
Design: Utilizes a large-piston, long-stroke hydraulic mechanism to draw down wellhead tubing pressure smoothly. This widens the drawdown pressure differential, establishing a stable, 24/7 gas output. The entire unit is housed inside an explosion-proof, sound-insulated container with a compact footprint.
2. H2000 High-Pressure Gas Lift Skid (Liquid Unblocking Unit)
-
Power System: 75 kW hydraulic station (80 kW total system power).
-
Performance: Delivers a maximum gas lift pressure of 15 MPa with a design displacement of 11,000 m³/day.
-
Design: Specifically built to purge the legacy fluid column at the bottom of the well. By running just 1 to 2 cycles of high-pressure gas injection, the unit flushes out dense liquid buildup, permanently eliminating the root cause of production throttling.
3. Off-Grid Self-Sustaining Power Package
-
Base Load: A 50 kW natural gas generator consuming 360 Nm³/day of field gas drives the H3000 multiphase pump during continuous operation, completely bypassing the need to upgrade the site transformer.
-
Peak Load: During the initial high-power gas lift phase, a temporary 100 kW mobile diesel generator supplements the load, staying well within the physical power limits of the remote wellsite.
Field Results: Unlocking Full Reservoir Potential
Production Comparison
BEFORE: 1,250 m³/day
AFTER: 10,000 m³/day (8x Increase)
Permanent Removal of Liquid Loading: After just two cycles of high-pressure gas lifting, the accumulated downhole fluid was completely evacuated. The liquid barrier vanished, removing the need for chemical soap injection.
8x Increase in Gas Production: Driven by the continuous drawdown of the H3000 multiphase pump, daily production surged from 1,250 m³/day to 10,000 m³/day, matching the region’s main producing wells.
Zero Grid Upgrade Costs: By combining an on-site natural gas generator with a temporary diesel backup, the operator eliminated capital expenditure on transformer modifications while drastically shortening the installation schedule.
Low Maintenance & Real-Time Monitoring: Thanks to low fluid salinity and low H2S levels, mechanical wear remains minimal. Full automation via a central control system allows off-site engineers to monitor tubing pressure, casing pressure, and gas flow in real time, reducing manual site visits.